The B-2 "Spirit" Bomber
In the 1994 Defense Authorization Act, Congress capped the B-2 bomber program
at 20 planes, down from the 132 stealthy bombers that the Air Force initially
wanted to attack the Soviet Union. Congress also capped spending for this
costly program at $28,968 million in 1981 dollars (currently equal to $44,656
million in then-year dollars).1 Through FY 1994, the Congress
has appropriated $39,639.7 million.1 The last of these 20 bombers
is to be produced in FY 1997 and delivered to the Air Force in FY 2000.
Estimated Cost of the First 20 B-2 Bombers
|
Cost for 20 B-2s (Then-Year $) |
Cost per Plane (Then-Year $) |
| Program Acquisition Cost (RDT&E and procurement) |
$44.65 Billion |
$2.2 Billion2 |
| Life Cycle Cost (RDT&E, procurement, operations and support) |
$49.9 Billion3 |
$2.5 Billion4 |
Still Paying for the First 20 B-2s
| Program Cost |
Actual FY 19955 |
Request FY 19966 |
Estimated FY 19965 |
Request FY 19975 |
| Procurement -- Item |
$345.1 million |
$279.9 million |
$742.5 million |
$216.9 million |
| Procurement -- Spares |
$2.2 million |
$59.1 million |
$58.7 million |
$122.2 million |
| RDT&E |
$365.5 million |
$623.6 million |
$589.2 million |
$446.2 million |
| Military Construction |
$23.2 million |
$24.6 million |
$24.6 million |
$5.4 million |
| Total7 |
$736.0 million |
$987.2 million |
$1,415.0 million |
$790.7 million |
Gearing up for 20 More B-2 Bombers
The Pentagon spent $4.5 million in 1995,8 as directed by Congress,
to determine whether or not additional B-2s were needed to meet operational
requirements -- that is the ability to fight two wars simultaneously, without
any help from allies -- and to preserve the bomber industrial base - that
is the ability to produce more bombers down the road should we choose to
do so. Both studies concluded that no additional B-2 bombers were needed.
Republican leaders in Congress, however, are determined that the Pentagon
will buy additional B-2 bombers, needed or not.
The President has not requested funds to buy B-2 bombers beyond the
20 previously authorized, nor has he requested funds to preserve the bomber
industrial base.9 The President directed that the $493 million
that Congress added to the FY 1996 Defense Appropriations Bill for additional
B-2s be used to modify a B-2 prototype bomber to the operational configuration,
bringing the projected B-2 force to 21 combat-ready bombers.10
The first 20 B-2 bombers cost $2.2 Billion each. Because money spent
on research and development are sunk costs, additional bombers would cost
a mere $690 million each, according to the manufacturer. The Air Force,
however, estimates the full cost (including operations and maintenance
costs) of each new B-2 at approximately $1.5 billion. An additional 20
B-2s would cost a total of at least $30 Billion over a projected 20 year
lifespan.
Projected Cost of 20 More B-2 Bombers
| Costs |
Cost of 20 B-2s (Then-Year $) |
Cost per B-2 (Then-Year $) |
| Flyaway Cost |
$11.4 Billion11 |
$570 million |
| Program Acquisition Cost |
$13.8 Billion3 |
$690 million |
| Life Cycle Cost |
$30.4 Billion12 |
$1.5 Billion |
The B-2 program was initiated in 1981. The program, however, remained
in the Pentagon's "Black Budget" until the mid-1980s. Hidden from public
scrutiny and congressional oversight, the cost of the B-2 program has risen
dramatically over the years. There is historical reason to believe that
the $1.5 Billion price tag will escalate.
Escalating Costs of the B-2
| Year |
Number of Bombers |
Total Estimated Program Cost |
Estimated Cost per B-2 |
| 1986 |
133 |
$58.2 Billion13 |
$437 million |
| June 1989 |
133 |
$70.2 Billion13 |
$528 million |
| early 1990 |
133 |
$75.4 Billion13 |
$567 million |
| April 1990 |
75 |
$61.1 Billion13 |
$820 million |
| 1994 |
20 |
$44.65 Billion1 |
$2.2 Billion |
Bomber Missions
Supporters of the B-2 argue that additional B-2s are needed to give the
United States the ability to destroy targets halfway around the world from
bases in the continental United States. The Congressional Budget Office
found, however, that "although bombers can fly missions directly from the
United States, it is difficult to sustain such operations for a long period."14
While it may take longer to get Naval forces with conventional sea-launched
cruise missiles and fighter planes carrying stand-off missiles in place,
these weapons can attack from a distance and maintain a quick pace. Even
in the unlikely event that the U.S. Air Force could not find a place in-theater
to base its fighter aircraft, the Navy's 11 aircraft carriers and large
supply of sea-launched cruise missiles (SLCMs) would allow the United States
to strike repeatedly from long range.
The B-2's mission does not require the ability to sustain an attack.
Originally designed to destroy any intercontinental ballistic missiles
(ICBMs) left standing in an all-out nuclear war with the Soviet Union,
the B-2 is now justified as a dual-capable bomber, capable of delivering
both nuclear and conventional weapons. The dual-capable B-2 is to act as
a "silver bullet," flying through enemy radar during the early hours of
a war to destroy key targets such as communications facilities and radar
sites. This is the same role played by the F-117 stealth fighter during
the Gulf War. Given the performance of the F-117, the capabilities of other
stand-off weapons (precision guided missiles on fighter aircraft and sea-launched
cruise missiles based on naval ships), and the arsenal of 21 B-2s, there
is no need to buy additional B-2s to perform this "silver bullet" mission.
The Decreasing Role for Nuclear Bombers
| Bomber |
Number in Service Today |
Projected Number in Service 2003 |
| B-52G/H "Stratofortress" |
94 bombers |
66 bombers |
| B-1B "Lancer" |
95 bombers |
convert to conventional missions |
| B-2 "Spirit" |
10 bombers |
21 dual-capable bombers |
Enhancing the Bomber Force
Instead of buying additional B-2 bombers for $30 Billion, there are readily
available, less expensive options to increase the size and capabilities
of the bomber force, according to Pentagon and Congressional Budget Office
studies.14,15 Keeping all 94 B-52 bombers at a cost of $3.1
Billion (FY 96 dollars) would have an immediate impact on the size of the
force whereas buying additional B-2s would not fully affect the size of
the force until at least 2008. Improving bomber capabilities, not number
of bombers, and buying more precision-guided weapons for the bombers to
carry would significantly improve the bomber force. The projected cost
through 2020 is a mere $1.3 Billion (FY 96 dollars). Stockpile spares and
support equipment could also be deployed at a few key forward bases. According
to CBO, this option "could provide more B-2 sorties and deliver more weapons
than a force with 20 additional B-2s during the critical first five days
and during the first 15 days of conflict" at a cost through 2020 of $1.8
Billion (FY 96 dollars).14
The Pentagon is currently studying the total mix of platforms and munitions
required to meet operational requirements. Unlike previous studies which
considered bombers vs. bombers, this study will look at the bigger picture
including the roles, tradeoffs, and cost-effectiveness of bombers, aircraft
carriers, fighter aircraft, and cruise missiles. It is expected to be completed
in early 1997.16
CDI Conclusions
Given the demise of the Soviet Union, the planned reductions in the already
large bomber force, and the availability of F-117 stealth fighters, there
is no need for the United States to commit precious resources for additional
B-2 bombers. The President's plan not to buy additional B-2 bombers, based
on the recommendations of two Pentagon studies, should be honored by Congress.
Notes & Sources:
-
"B-2 Bomber: Cost to Complete 20 Aircraft is Uncertain," General
Accounting Office, GAO/NSIAD-94-217, September 1994.
-
Each plane is worth four times its weight in gold.
-
Defense Week, 5 July 1994.
-
"B-2 Bomber: Status of Cost, Development, and Production," General
Accounting Office, GAO/NSIAD-95-164, August 1995.
-
Numbers taken from FY 1997 Program Acquisition Costs by Weapon System,
Department of Defense, March 1996.
-
Numbers taken from FY 1996-7 Program Acquisition Costs by Weapon System,
Department of Defense, March 1995.
-
The author has chosen to use numbers from PACWS (see endnotes #5 and #6)
for this chart, in order to compare 3 years of actual, estimated, and requested
spending plans using the same accounting methods and terms. It is important
to note that the numbers given in PACWS frequently differ from those in
Defense Appropriations Bills and Reports (e.g. according to the FY 1996-7
PACWS, the President was requesting $987.2 million for the B-2 bomber program,
but using Defense Appropriations figures, the President was only requesting
$921 million. It was to this latter figure that Congress added $493 million.)
The discrepancy is due to accounting procedures. PACWS includes procurement
of spares and military construction whereas the Defense Appropriations
figures, based on the Procurement-1 (P-1) and RDT&E-1 (R-1)
documents also distributed by the Pentagon, do not. The Defense Appropriations
numbers do, unlike PACWS, include money allocated for modifications to
a given weapon. If one were to add up all the categories (procurement of
items and spares, RDT&E, modifications, and military construction),
total appropriations for FY 1996 for the B-2 total $1,004.7 million. (Neither
PACWS nor information from Defense Appropriations include money spent on
operating and maintaining the weapon system once acquired.)
-
DoD News Briefing by Captain Mike Doubleday, 8 February 1996.
-
Statement by the Press Secretary, B-2 Bomber Review, 8 February 1996.
-
Aerospace Daily, 22 March 1996.
-
Defense Week, 6 February 1996.
-
Aerospace Daily, 10 August 1994, citing CBO.
-
"Strategic Weapons: Long-Term Costs Are Not Reported to the Congress,"
General Accounting Office, GAO/NSIAD-90-226, August 1990.
-
"Options for Enhancing the Bomber Force: Summary," Congressional
Budget Office, June 1995.
-
Aerospace Daily, 21 June 1995, 13 July 1995; Dod News Briefing with
Dr. Paul G. Kaminski and Press Release #237-95, 3 May 1995.
-
Statement by the Press Secretary, B-2 Bomber Review, 8 February 1996; Transcript
of Press Briefing with Robert Bell, Senior Director for Defense Policy
and Arms Control at the National Security Council, 8 February 1996.
Prepared by Kathyrn Schultz, Research Analyst, 1 May 1996.
For more information on the B-2 Bomber, please contact Chris
Hellman.